Skip to content

Roadmap after launch scope

Master Prompt 20 §6. Order and evidence come from ADR-016. Nothing activates by binary version: each module activates through governance at a written-down height, after its audit.

Before any mainnet (blocking, from ADR-016)

Section titled “Before any mainnet (blocking, from ADR-016)”
#WorkEvidence that it is doneAudit
1Wire DAG-BFT into the node (ADR-015)cargo xtask go-no-go passes “DAG-BFT wired”; conformance vectors for the commit rule(b) consensus
2Staking and slashingspec section + vectors; slashing tests with remote-signer evidence(c) state machine
3Activate the fee marketthe node links maya-fee-market, with a finite activation height; econ findings on burn share and validator floor addressed (reports/18-economics.md)(c)
4Verified-signature cache (93 % of apply time)apply_pipeline before/after(b)
5RPC, finality, sync and missed-round metricscargo xtask slo-check green(d) operations
OrderModuleEvidence that brings it inAudit
1Shielded poolexternal audit of the joinsplit AIR (CIRCUIT_IS_AUDITED)(a) cryptography
2Smart accounts (key hash on the wire)wired into the transaction format; conformance vectors(c)
3DeFi / RWA / identity modulesper-module spec, invariant hooks, load tests(c), per module
4Neural gastrained on testnet traffic and beating plain EIP-1559 in econeconomics + determinism
5Threshold-lattice custodypeer review of the dealerless keygen (ADR-014)(a)
6HQC second KEMconstant-time implementation (ADR-009)(a)
7Multi-VM (EVM)gas-parity suite; classical-security labelling (ADR-023)VM + EVM
—zkML, PoUW, exotic transports, frontier HALthe evidence ADR-016 names; none is scheduled—
  • Second client: close the spec gaps first (VM, extra state layers, consensus; docs/SECOND_CLIENT.md), then fund by treasury grant (crates/treasury staged approval).
  • Cryptographic watch: docs/CRYPTO_WATCH.md, reviewed quarterly.
  • Scaling milestones tied to measured limits (reports/14-scale.md, ADR-021):
    • raise the validator cap above 100 only with STARK-aggregated certificates that meet ADR-021’s acceptance test;
    • raise the block target only with a measured capacity review.